Tuesday 8 November 2011

Step 3 - BUIT 4545 PRESENTATION, Q12: INSTALLING INTERIOR DOORS



Step 3 -  This looks at undoing the leaf so that it can swing backwards & forwards, by removing the nails that is holding it shut, then reusing these nails to make temporary door handles until hardware is installed.
Also deals with adding packers at hinge points that are the predetermined thickness (door frame measurement minus the door jam measurement, which is then divided in two).  In this example it is a 17mm difference, so packers will need to be 8.5mm along hinge side of door.
This video also Investigates how to use a level to ensure the packers on the vertical will make the door jam sit plumb.

No comments:

Post a Comment