Monday, 20 June 2011

Workshop: Roof Frame Practical

Today we got rained off site, so started on our roofing practical in the workshop which was to make a roof frame like the one on the Unitec building (but on a smaller scale).  We split into groups and were each given a different pitch.  
I was with Ben, Erin & Periri & our pitch was 42degrees.  Using this information we were able to calculate the length of the rafter and rise.  We did a mock plan on a piece of paper & based our run on the length of the workshop table.  We did this plan so that we could get the angles for the two different area's 
on the roof that would require them (so we could figure out their pitch).  
Once done, we started cutting out 6 rafters to length with the angle cuts at the end (one to sit flush against table surface (which was acting as our top plate) and the other to sit flush against the ridge).
The ridge board was then cut (which was the length of the table with 200mm added to each end to account for the overhang).  On the ridge, a running measurement was done to figure out where the rafters would sit along it.  This was done by taking off the 200mm for the overhang, instepping this by 150mm then every 400cr.  These same markings were also done along the span of the table (starting from the 150mm instep as the 200mm overhang is not present along this length).  
Once all the markings were done, the rafters were temporarily tacked down to the table, and then the ridge was inserted down the middle of these rafters.  The rafters had to be flush with the bottom of the ridge board and the markings previously scribed.  A level was then used to make sure that the ridge board was centered by runnng vertically at the rise & also along the top of the ridge board as well.  Once correct the rafters were nailed in to the ridge board.  
We then started prepping the gable end rafters to sit lower to support the outriggers & fly rafter.
This was done by scribbing out on the table the thickness of the rafter (as this is the new line that it must sit on the table.  The length from mid way through the thickness of the ridge, down to new marking on the table is then taken (as this is the length of the gable end rafter.  The same angles as the other rafters were then cut with an edge cut taken so that they both join under the ridge and are flush with the bottom of the ridge.  These were then also attached as the other ridges.  

Wednesday, 15 June 2011

Brace Elements



Once we finished our nogs & other jobs left over from yesterday, we started doing bracing elements.  
Roof plane bracing was run out by calculating the run of the house & then transfering this measurement along the length of the house as well.  This gave the 45 degree angle required to attach the metal strap bracing.  Two people then held the strapping at either end (which is run at a diagonal over the apex of the gable end roof truss down to the top plate & the other end goes over the double top plate down to the top plate.  One end is secured down with a minimum of 6/75x3.15 & then the other end is tensioned as much as possible before nailing in (with the same fixings).
Once done, a tensioner is put on the strap to pull it tighter (as pictured on right) & then the straps can be nailed in where ever it crosses a truss.  before it is secured, someone should stand at the end of the truss so that they can check the truss is aligned before driving in the fixing.    This process should be repeated for the opposite diagonal (which will make a cross
plane bracing - as pictured).
These roof plane bracings are located at every corner of the Unitec house.  


Roof space bracing also secured into place.  On the Unitec building these are located at either end of the building and also in the middle of the roof spacing.  It should not be at a pitch greater than 45 degree's.  A nog needs to be placed in at the apex so that the top of the roof space bracing can be attached to it. It is then secured at the angle on to the ceiling runner
If it runs greater than 2meters along the ceiling runner it needs to be doubled up so that it has extra strength.

Tuesday, 14 June 2011

Catch Up What Happened With Wall Frames & Trusses

Last of the wall framing steps was to straighten/square the walls, and then attach the double top plate (in particular on the exterior walls - so that roof trusses can be attached).  This involved using temporary braces to hold everything in the correct position. 
Pre-nailed trusses arrived on site in a packet (much like the wall frames) with additional packets for purlins, outriggers, noggings, ceiling runners and dragon ties etc.  Had to be careful lifting them up on to the roof, as twisting them can result in them weakening.  Before they could be put onto the roof, markings were put along the double top plate at the spacings pre-determined on the roof plan.  Working in teams they were lifted up on the scaffold & then slid across to the interior walls which acted as support.  For the lounge area where there were no intermediate supports, people were waiting on saw horses to give support.  
Gable end trusses put up first.  Stopper blocks put at the  wall frame to stop it slipping off when aligning with the wall frame.  On the edges the bottom chord is made flush with the double top plate.  Once in correct position it is secured with 2/100's skew nailed.  
A stringline is then run between the two gable end trusses at the apex, which gives a center mark for the other trusses to be lined up with.  Intermediate trusses can now be attached by lining up with pre-marked lines on double top plate & stringline.  As each truss is attached, a spacer block is put between them to check that it is the correct spacings & then a temporary brace is attached. Once done, a ceiling runner was run along the bottom chord on edge throughout the span of the trusses.
Today we also put nail plates & cyclone ties down over all major joins to strengthen the joins for structural loads that may 


be placed on it this was particularly important where the trusses sat on the double top plate.  Staples were also put on the building, running from every top plate to full length stud.  These had to be recessed in so that the wire dog staple sat flush.
Some of the team also started attaching the soffit nogs along the length of the BL.  This was attached 20-30mm from wall frame line which was to allow for cavity battens to be inserted and wall lining.  
The Unitec building has some large overhangs, so the trusses are strengthened with 'scab's' in this area to combat the additional load to the area.  
Outriggers were also inserted on the gable end truss.  This sat lower than the intermediate truss directly after it, so that it formed a platform for the outriggers to sit on.  The outriggers were spaced according to specifications on plan & were end nailed in to the truss it was butted into & skew nailed in for the gable end truss that it sat on top of.  Outrigger nogs were also inserted at 20-30mm from gable end truss face (like for the soffit nogging).  


Wednesday, 25 May 2011

Setting Out & Making Wall Frames From Beginning!


Today we assembled the last two wall frames on the house, but cutting materials and setting out  using a 'panel elevation report'.  First step was to choose the straightest lengths of timber (for the top and bottom plate) & cut to length.  I good way we learnt, was temporarily nail these lengths together and mark out measurement on the top one & cut together.  Not only does it make the process faster, but it becomes more accurate a cut as they are both cut at the same line.
A running measurement is then done along the length, marking out the placement of the different elements of the wall (as in photo above).  These marks should be put on the edge, as this is the side we will see when setting out.  When the measurements were marked off,  a combination square was used to show lines where these members are to lined up against.  If jack studs were present above a door opening, it was only marked out on the top plate as it wouldn't reach down to the bottom.  Once done - the top and bottom plate can be seperated & studs can now be cut.
Length of stud is calculated by taking the ceiling height and adding 20mm for the thickness of the ceiling & floor board & then deducting the thickness of the top and bottom plate.  For the Unitec Building this is: 2400 + 20 - 90 = 2330.  Once they are cut, they are lined up between the top and bottom plate at the places previously marked out & are aligned accordingly.  Once positioned correctly, they are nailed in with 2/90 flat heads.
Once these are all done, the bottom plate is temporarily tacked into the floor along a straight edge using bright nails (as galvanised would damage floor too much) & the diagonals are checked.   Once these are correct, the top plate is then temporarily nailed in to the floor as well.
Packing can be added now are should be atleast 250mm and placed so that one is at the bottom and top of the packing gap and then every 800cr's.
Noggings can then be done.  These should fall where ever particle board edges for the wall's may be, as it provides the surface for them to be fixed to.  The last row of nogs should be left out so that it allows room for adjustment of the length (by checking with a tape and adjusting the length of the nog accordingly).  
Lintels, jackstuds, understuds may also be required and are attached accordingly.
The next thing we did, was add a metal angular brace.  This was done by taking the length of the bracing required (in this case 2.4m) & measuring it out along the bottom plate.  A straight edge was then run from this point to the top plate at a diagonal, and this angle was then marked out on each stud it intersected.  
A skill saw was then set to the depth of the angular brace that was being inserted, and cuts were made at these marked out spaces.  Then angular brace was then inserted in, to make sure that it sat straight and ok & then to allow the metal brace to sit flush with the wall (so that it didn't affect fixings)  a section was checked out so that a recess was achieved.  The brace was then put into its place & fixed with a minimum of 2 nails.   


Tuesday, 24 May 2011

Finished on floors - Hello Wall frames!!!


We had a little bit of the flooring to finish off this morning, but after lunch we started on the wall framing.  In order to get started we had to clear the floor sheets of any residual glue that had expanded from the joins of the sheets when drying, & also check the alignment of the floor.  Once done, we attached pieces of timber around the boundary joist (as pictured in top left photo). This was done in order to stop the frame from slipping off the edge when we were putting them into place.
As we are dealing with pre nailed frames, they arrived on site by truck & we had to assemble by referring to the plan that came with it.  Each frame is labelled on the top with a number which corresponds with the plan, along with the word 'top' so we knew what edge was to be on top when securing.  The frames were tied together using a combination of nail sizes.   Once aligned in correct place, a clamp is used to hold the two frames together, using a hammer the frame is then lined up with the pre-marked lines at the bottom.  The frame is tied at the bottom on either side at an angle with a 75mm nail.  The same process is done on the top as well.  The frame is also checked to be flush.  If there is a discrepancy, a sledge hammer is used to hit it down until it is.  Once done, the frame is tied in the same manner.  Down the vertical length of the joining frames, 2 nails side by side are nailed at 800cr (approximately just below or under the nogs), which is referred to as stitching.  Before they are driven in, a straight edge is put up against the frame to check for any bows.  If there is a discrepancy here, a chisel is used (much like when we were tightening up the floor sheets together) to leverage it straight.  When it is in line with the straight edge, it is nailed in at this setting with 100mm nails.
Along the bottom of the frames are figures, which represent the spacing between the studs (such as doorways, windows, stud spacings) & therefore the measurement of the noggings.
Noticed that some frames have metal bracing through the frames.  This is done as specified by the manufacturer, or what is called for from the plans.
Above is straight edge along wall frame join to check for bows & shots of boys doing the framing.
At the end of the day, we had put up all the pre nailed frames.  We still have a few corners to check for alignment and to tie in, but the majority of it is done.
At the end of the house, we had to put in some bracing as we have the end wall section missing as we are going to build this ourselves.  To keep it stable this had to be done, as there is no framing to add support the pre nailed frames laid along the length of the living room space.

Monday, 23 May 2011

Getting cracking on the flooring


Big day today to try and knock out the flooring so we can move on to wall framing tomorrow.  Didn't quite do it, but not too much to go - so BUIT 4543... here we come!!!  Basically just carried on from last weeks efforts with the sisalation & fixing floor sheets, but was a good focused bit of mahi today because I was able to get a bit of clarification on some things that I was a little unclear of last week.
Found out when glueing its a good idea to put the glue on the edge more to the top (than the bottom) so that when the particle board is attached, it isn't pushed under the sheet and cause level discrepancies, but rather pushes up and seals the gap between the floor sheets.
Was pretty difficult hammering the nails in today, once the glue had got on the hammer head - as it kept slipping off on impact and sending the nail off angle.  Got a good tip from Marty to carry a bit of sandpaper around, this way you can get rid of any build up of glue and stop the hammer from slipping.
With the nails on the particle board, I got some clarification on the spacings.  Around the edges this should be distributed every 150mm (if along nogging - otherwise at every joist that the particle board sits on).  Along the joists in the interior of the particle board, the increments are every 200mm.  When measuring these increments, a good tip is to pre mark out the spacings on a straight bit of timber the width of the particle board (rather than having to measure out at each joist line.
Along the boundary joists, the particle boards weren't pre-cut (like we had done for interior sections - like in the wet areas), but done in one go after it was fastened on.  Rich taught us to use a straight edge tacked into place at the right measurement (which was to measure the overhang with a 8mm tolerance inwards, plus the width of the guard of the skill saw).  The skill saw blade was set so that it went the depth of the particle board only (and wouldn't damage the boundary joist underneath), and then was guided along the straight edge to make a even cut and the right measurement.

Wednesday, 18 May 2011

More sisalation & starting with particle board

Continued on with what we started yesterday.  Got to start putting down some of the particle board too.  Many ways you can lay it.  Full sheets can be put down into position and then cut to shape afterwards, or it can be cut before hand.  On Rich's house we are going to precut.  On the particle board there is a specified side which should be facing down, and the other is to be the floor surface.  The first sheet that we put down was in the center mark of the house (which sits on top of the center bearer line).  Special glue was applied to each square section cut out from the sisalation along the joist (that the sheet was going to sit on).  It is important to move quickly once the glue is applied as it sets in approximately 10minutes time.  The glue is really important, as it obviously helps keep the floor fixed tight, but also can help in reducing 'squeaky' floors as well.
The particle board is then laid down and moved to ensure that is sitting flush and straight before it is nailed down.  It is important that this is done, as otherwise it will throw out the rest of the floor sheets that are butted up against it, as they will all subsequently be lined up with this one.  As the particle board is prone to damage, aligning the sheet to sit plumb was done using chisels to lever it into place (rather than hitting the hammer on the edge which could chip the board, & create an uneven surface for the next sheet to sit against).  
Once aligned correctly, it is nailed into place using flooring nails.  Along the edges where they sit on a joist the nails should be fixed at least 10mm away from edge (to avoid chipping) and at increments of 200mm.  On the edges, nails are placed at each joist that the particle board lies on (again 10mm minimum from edge).
When the next sheet is added, it must be butted up as close to the previous sheet as possible.    Glue is applied to the edge of the already fixed floor sheet and again along the joists in the cut out squares in the sisalation.  This time the board is levered in using the chisels as close as possible & of course straight as well against this fixed particle board.  Whilst people are holding it in, the same process is used to fasten it into place.   The sheets are going to be attached in a pattern so that they are intervaled, and certain areas of the house are going to have different sheets as they are wet areas.  In these places we will be putting ply down, which is why we have to cut different pieces of timber for different areas of the floor.  
If a mistake is made when laying down a sheet of flooring, and is removed, it is important to try and do before the glue dries, as otherwise it can cause damage to the particle and make it un-usable.
It is best to let the glue dry on the particle board and then plane it off.  Where there is residual glue left on the joist and edges of already fixed sheets, this really needs to be removed well, as it will cause the next sheet being put in this area to be uneven and not level.  As the glue dries it expands out, so it is best to wait for this to happen before chiseling this away & removing.  When applying the glue along the edges, Rich also said to keep it towards the top and in a flowing line, this way it shouldn't ooze too much under the board and make it unlevel - but rather out to the top.  Its usually a good sign that you have aligned the floor board well if it gets a bead of glue at the top as well.